PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing the curtain wall returns atColumn Line E  -2 South Elevation.jpg Closing up the cmu wall at Sally Port 141 Facing West.jpg Laying out block at the 1st floor Search Room 144 Facing West.jpg Closing up the cmu wall at the 1st floor Attorneys Room Facing East.jpg Installing copper piping at the 1st floor Facing West.jpg Installing copper piping at the 2nd floor bathroom Facing East.jpg Installing exterior framing at the 2nd floor Facing North.jpg Installing motorized damper controllers at the 3rd floor Facing North-West.jpg Copper piping going up through the 3rd floor Facing North.jpg
Previous pageNext page Installing copper piping at the 1st floor Facing West
Installing copper piping at the 1st floor Facing West